Iteration 0.8.0-n (Friday Nov 02, 2012)

1. Sprint Release (19th Oct 2012 – 1st Nov, 2012)

  • 0.8.0-n
  • Release date - Nov 2nd, 2012

2. Tag Information

3. S&A Deliverables

4. Deliver Deliverables

S.No

Type

JIRA

Summary

Comments

1

Sub Task

OLE-3344

Create Patron Record (DLVR_CREATE_PATRON_RECORD)


2

Sub Task

OLE-3346

Update Patron Record (DLVR_UPDATE_PATRON_RECORD)


3

Sub Task

OLE-3354

04.06 Circulation Checkout(DLVR_CHKOUT_VALID_PATRON)

The following patron validation is not completed.
1. number of overdue items currently checked out to the borrower is below the limit
2. number of days overdue is below the limit (i.e., block occurs if at least ONE overdue item exceeds the limit)
Other patron validations are working fine.

4

Sub Task

OLE-3355

04.06 Circulation Checkout(DLVR_CHKOUT_VALID_ITEM)

b)The following item validation is not completed.
1. Checkout with a Pending Recall/Delivery, Hold/Delivery or Page/Delivery Request
2. Checkout of an On Hold Item

Other Item validations are working fine

5

Sub Task

OLE-3356

04.06 Circulation Checkout(DLVR_CHKOUT_CALCULATE_DUEDATE)

Calculating due date working fine except :
Configuration for open/close time and calender for holiday is not complete.

6

Sub Task

OLE-3360

04.06 Circulation Checkout(DLVR_CHKOUT_VALID_PROXY_PATRON)


7

Sub Task

OLE-3357

Circulation Checkout(DLVR_CHKOUT_CREATE_LOAN)

Functionality Completed and working fine:Creation of Loan transaction, Displaying Bib,item details and due date and updating the item status and effective date in the item level record.
The following patron validation is not completed.
1. number of overdue items currently checked out to the borrower is below the limit
2. number of days overdue is below the limit (i.e., block occurs if at least ONE overdue item exceeds the limit)
b)The following item validation is not completed.
1. Checkout with a Pending Recall/Delivery, Hold/Delivery or Page/Delivery Request
2. Checkout of an On Hold Item
c)Due date validation is not completed.
Configuration for open/close time and calender for holiday is not complete.

8

Sub Task

OLE-3353

04.06 Circulation Checkout(DLVR_CHKOUT_PERFORM_CHECKOUT)


9

Sub Task

OLE-3310

Checkin Partial Checkin Note (DLVR_CHKIN_PARTIAL_CHECKIN)


10

Sub Task

OLE-3305

Checkin Session (DLVR_CHKIN_PERFORM_CHECKIN)

Perform check-in includes 
1. itemValidation ,
2. numberOfPiece Validation (Partial Check-in),
3. overdueFine calculation and if it exceeds maxFine, update fineRate to maxFine are all done,
4. updating itemStatus based on location and itemStatus, 
5. removing loaned record from the patron document, 
6. Created circulation history and temporary circulation history records,
7. Temporary Circulation record is added in the patron document, 
8. Patron Bill is created for every overdue item display of bill is in progress,
9. Request Type validations are done functionally not implemented in the screen.
10.And displays itemDetails(Barcode,Title,Author,ItemLocation,Call Number,Check-in date and ItemStatus) as a list in the screen.

11

Sub Task

OLE-3312

Override Option (DLVR_CHKIN_OVERRIDE_OPTION)


5. System Integration Deliverables

S.No

Type

JIRA

Summary

Comments

1

Task

OLE-2400

Auto ingest of basic sample date + workflows/permissions available for the application features to be functional.
All this happens during as the application is coming up and before its fully deployed.

Tested locally + dev.

2

Task

OLE-3399

Configuration of CI jobs for OLEFS Unit Tests and OLERICE2 and OLEDOCSTORE in Sonar in the new CM environment

1. http://ci.rice.kuali.org/view/ole-0.8/job/ole-0.8-unit-test 2. http://sonar.kuali.org/dashboard/index/25877?did=1

Operated as a Community Resource by the Open Library Foundation